Client: Xella Group
Sector: Building materials / Industrial construction

Arrowblack

At one of the production sites of Xella Group, a world leader in the production of building materials, a major installation of a ModulGO 20×20 industrial cover has recently been completed.

The project is a further example of how modular solutions can respond effectively to the needs of modern industry, ensuring short lead times, structural reliability and maximum operational efficiency.

A tailor-made project for the industrial sector

The ModulGO 20×20 cover was designed and installed to protect two large tanks used for containing and processing insulating materials within the Xella Group production site.

The main objective of the project was to ensure functional protection of the production areas, while at the same time improving space management and the operational continuity of the plant.

A high-performance modular solution

ModulGO industrial covers are proving to be a high-performance solution for the construction and manufacturing sectors thanks to their modular structure and speed of installation.

In the specific case of the Xella Group project, the 20×20 structure made it possible to efficiently cover a large area while maintaining high standards of strength and stability.

Installation completed in just 4 days

One of the most significant aspects of the project was the particularly short completion time. The entire installation was in fact completed in just four working days.

This result was made possible by precise planning of activities, efficient site management and the use of high-efficiency prefabricated systems.

Advantages of the ModulGO system

The project highlighted some of the main advantages offered by ModulGO technology:

  • Significant reduction in installation times
  • High design flexibility
  • Strength and durability of the structure
  • Optimisation of industrial spaces
  • Adaptability to different production configurations

These features make the system particularly well suited to complex industrial settings such as that of Xella Group.

Efficiency, precision and collaboration

The success of the project is the result of collaboration between all the parties involved, who worked with precision and coordination at every stage of the installation.

The combination of technical expertise, organisation and speed of execution made it possible to fully meet the set deadlines and objectives.

Conclusions

The installation of the ModulGO 20×20 cover at Xella Group is a concrete example of how modular industrial solutions can provide effective answers to the needs of the manufacturing sector.

A project that confirms the value of custom design and innovation applied to industrial construction, with particular attention to lead times and the quality of the final result.

  • ModulGO – Tunnel modulare – PVC mobile tunnel GLG

    ModulGO – Tunnel modulare

    Con passi fino a 5 metri

    Fisso
    Mobile
    Quattro falde
    Doppia falda
    PVC 750 gr/m²
    Acciaio verniciato RAL
    Si
    Nessun limite
    Tralicciata maggiorata
    0 out of 5

    Una robusta struttura in acciaio con copertura in manto PVC ad alta resistenza. Grazie a passi tra le capriate di 5 metri, questo progetto ti offre una maggiore flessibilità, sfruttando l’altezza della copertura fino a quasi 10m ed ottimizzando la cubatura al meglio.

    [contact-form-7 id="2664d58" title="Generico Tunnel"]

I would like to receive support.

Quick quote

RICHIESTA GENERICA [EN]
📌

Leave a Reply