Skip to main content
Products designed for you    •    Rapid doors for cold stores 0/+4°    •    Self-repairable rapid doors    •     Fire and smoke doors REI 60 e 120    •    Dedicated consulting support    •    Customized development of the world’s largest industrial doors
📌 Location Via Giulio Locatelli 22, Pocenia (UD)
Client: Modine
Field: Manufacture of thermal installations

progettazione tunnel frontale mondine spa

New movable tunnels for Modine SpA

The expansion of the production space is often a necessary step for companies that want to increase their production capacity and improve their operational efficiency by creating new covered spaces for the storage of goods. A company that is looking to expand its space can consider installing two movable front tunnels as an ideal solution to achieve these goals. In this article, we will examine the case study of Modine SpA, a leading company in the construction of thermal plants, which relied on GLG for the installation of two movable front tunnels, the first to obtain an additional storage area and the second, of smaller size, to protect their industrial equipment.

The design of the two movable front tunnels took into account the expansion needs of the company. In particular, the size of the production site and the required storage capacity were assessed. The movable PVC tunnels have been designed to ensure maximum flexibility and ease of material handling, as well as to resist weathering and mechanical stress.

The installation of the front movable tunnels was carried out directly by our technicians, who in just two days, managed to erect two fully functional front structures. The installation required the preparation of the site, the installation of the foundation, the construction of the walls and the PVC roof of the tunnels, and the installation of the lighting system. In particular, the foundations have been built in such a way as to guarantee maximum structural stability and resistance to mechanical stress, while the tarpaulin walls and the PVC roof of the tunnels have been made with resistant and high quality materials.

After the installation of the front movable tunnels, we carried out a series of checks to ensure that the system of the two metal frontal structures met the needs of storage space and guaranteed maximum flexibility and ease of material handling. Thanks to the installation of the front movable tunnels, Modine SpA has been able to expand the covered storage space, significantly improving its warehouse logistics. The construction of two movable PVC front tunnels allowed the company to manage a greater volume of goods and to cope with the growth of the business efficiently and effectively.

  • tunnel frontali in pvc - glg doors

    FrontGO – Front movable tunnel

    Movable
    Double pitched
    Mono-slope
    PVC 750 gr/m²
    light-grey-ral-7035
    Galvanized steel
    Si
    Nessun limite
    External
    4.50 out of 5

    It is a movable tunnel constructed in direct attachment to the existing hall. This solution serves as an excellent means to expand the internal working area of the main hall.

    [contact-form-7 id="c182c61" title="EN_Generico Tunnel"]

Two logistics solutions, one goal: to expand frontally.

Thanks to the installation of the two front movable tunnels, the company has been able to expand its working spaces without having to resort to the use of masonry, “old-style” solutions now too expensive for those who need to cover their logistics areas in a short time. Moreover, the installation of the two frontal movable tunnels allowed the company to manage a greater volume of goods and to cope with the growth of the business in an efficient and effective way. Finally, the front mobile tunnels represent a flexible and versatile solution, able to adapt to the storage space needs of any company.

I’d like some support.

Quick quote

RICHIESTA GENERICA EN 2

📌