Skip to main content
Products designed for your industry• Rapid doors for cold stores 0/+4° • Self-repairing rapid doors • Fire and smoke doors REI 60 and 120• Dedicated consulting support • Customised development of the world’s largest industrial doors
📌 Location Via F. Zani 104, Boretto (RE)
Client: MECA
Sector: Sheet metal processing, laser cutting.

Arrowblack
Logo
tunnel laterali doppia pendenza in pvc

A side tunnel to enlarge your warehouse.

The Meca Group, a company in the province of Reggio Emilia specialised in sheet metal processing, punching, laser cutting and sheet metal bending, has recently decided to expand its factory with the installation of a side movable tunnel. This innovative solution, exempt from property tax, improves industrial logistics by increasing productivity and job quality. The side tunnel installed at the Meca Group plant has a surface area of around 100 square metres. This solution allows to connect the various production departments of the company, improving internal logistics and ensuring greater efficiency in material handling. In addition, the side tunnel is equipped with a high-quality steel structure, resistant to weathering and external stresses. Thanks to its robust structure, the mobile tarpaulin tunnel can also be used for the transit of heavy vehicles, such as forklifts and transport vehicles. The installation of the side tunnel has allowed the Meca Group to improve the safety of its operators, who can now move from one department to another without having to cross the production areas. Moreover, the tunnel allows to reduce the times of displacement of the materials, improving the productive efficiency and guaranteeing a greater precision in the management of the supplies. In addition, the double-pitch side tunnel represents a sustainable choice for the environment, thanks to its ability to reduce energy consumption and improve logistics efficiency. Thanks to its covered structure, the mobile shed allows you to protect materials and equipment from the weather and the sun, ensuring a longer life. Finally, the installation of the side warehouse represented a significant investment for the Meca Group, but the long-term benefits were very important. Thanks to this innovative solution without the construction of additional masonry works, the company has managed to improve its production efficiency, the safety of its operators and the energy efficiency of its industrial building.

  • SideGO – Tunnel laterale monopendenza – PVC mobile tunnel GLG

    SideGO – Tunnel laterale monopendenza

    Tunnel da affiancare al capannone

    5 out of 5
    Mobile
    Mono falda
    PVC 750 gr/m²
    Acciaio zincato
    No
    Nessun limite
    5.00 out of 5

    Questo tunnel viene usualmente piazzato affianco del capannone primario ed è formato da una struttura scheletrata in tubolari imbullonati zincati in grado di sostenere il manto in pvc che lo ricopre.

    [contact-form-7 id="2664d58" title="Generico Tunnel"]

  • SideGO – Tunnel laterale bipendenza – PVC mobile tunnel GLG

    SideGO – Tunnel laterale bipendenza

    Tunnel per espandere capannone

    5 out of 5
    Mobile
    Doppia falda
    PVC 750 gr/m²
    Acciaio zincato
    No
    Nessun limite
    Esterno
    5.00 out of 5

    Questo tunnel viene posto solitamente in adesione all'edificio esistente o tra 2 edifici. Esso è formato da una struttura scheletrata in tubolari imbullonati zincati in grado di sostenere il manto in pvc che lo ricopre.

    [contact-form-7 id="2664d58" title="Generico Tunnel"]

The right choice for efficient storage.

In conclusion, the installation of a double-pitch mobile side tunnel can be a strategic choice for companies wishing to improve their industrial logistics and increase their productivity. Thanks to its robust structure and its advanced technical characteristics, the side movable tunnel can guarantee important long-term benefits for the company, improving the safety, efficiency and sustainability of its activities.

I’d like some support.

Quick quote

RICHIESTA GENERICA [EN]
📌